|
|
|
Though
Lytle Construction Services is new to the industry,
its employees are seasoned professionals with years
of experience in the business. Working with their former
employers, personnel now employed by Lytle Construction
Services had significant involvement in each building
pictured in this project gallery.
|


Pittsburgh,
PA
- Design
/ Build
- Completed
04/01
- 4-story
steel structure
|
- $12,000,000
- 160,00
SF
- Landscaped
grounds
|
This
project included significant planning,
constructability reviews and value
engineering. It includes office
space, a fitness center, coffee
shop and a two-story lobby.

|
|

 Pittsburgh,
PA
- CM
at Risk
- 41,040
SF
- Office,
retail and restaurant space
|
- $2,500,00
- Completed
10/02
- 3-story
building
|
This
project included construction management
and general services for a building
with retail and restaurant facilities
on the ground floor. The second
and third floors house office space.

|
|


Pittsburgh,
PA
- CM
at Risk
- 228,000
SF
- 1-story
garage underground
|
- $26,000,000
- Completed
12/02
|
This
project included a tenant fit-out
on the fourth, fifth and sixth floors.
The fit-out work consisted
of installing a raised floor system
for Alcoa's data communications
systems.

|
|

 West
Mifflin, PA
|
|
- Completed
1995
- Part
of 46,000 SF development
|
This
complete turnkey project required
interfacing with various governmental
agencies for access to a major state
highway. The building was
constructed in nine months.

|
|
 Duquesne,
PA
- CM
- Completed
12/99
- 96,000
SF
- Award
Winner
|
- $5,000,000
- 25'
high freezers and coolers
|
This
food distribution center won the
Three rivers Environmental Award
and a LEED Silver Rating for its
green and sustainable aspects. It
was completed on budget and a month
ahead of schedule.

|
|


West
Mifflin, PA
- GC
- Completed
1995
- Structure
built in 7 months
|
- 13,000
SF
- Access
roads to a state highway
|
This
13,000 SF turnkey project included
site development and required interfacing
with various governmental agencies
for access onto a major State Highway.
This structure was one part of an
entire site development including
access roads as well as two other
buildings. Total square footage
of rentable space on this site is
13,000 SF. Kinko's Retail Space
was constructed in seven months.

|
|
 West
Mifflin, PA
- GC
- 5,000
SF
- Project
completed in four months
|
- Completed
12/94
- Turnkey
project
|
This
project included site development
and required interfacing with various
governmental agencies for access
onto a major state highway. The
structure was part of a larger 46,000
SF development.

|
|
 West
Mifflin, PA
- GC
- Completed
12/94
- Project
completed in six months
|
|
This
facility included site development
and required interfacing with governmental
agencies for access to a major state
highway. The project was constructed
in six months.

|
|


Monroeville,
PA
- GC
- Completed
in six months
|
|
Facade
removal and renovation performed
during normal business hours allowed
tenants to remain open. Renovations
included the installation of new
structural steel, glass curtainwall,
and EIFS construction.

|
|

 Monroeville,
PA
- GC
- Completed
in seven months
|
- Over
250,000 SF retail space
|
Strip
center has two anchor tenants. Site
work included 1000 CY of rock removal.
Construction was completed in seven
months despite site constraints.
Façade consisted of concrete, FRP
column covers, EIFS, and metal roof
canopies.

|
|

 Bridgeville,
PA
- GC
- Completed
in nine months
|
|
This
facility was built for mixed-usage
tenants. The structural steel frame
supports a mix of materials including
glass curtainwall and cedar. The
fireplaces significantly enhance
the third floor tenant space.

|
|

 Monroeville,
PA
- GC
- Completed
in seven months
|
|
The
scope of work for this strip center
was comprised of a masonry load-bearing
curtainwall, structural steel frame,
approximately 300 LF of glass storefront,
sign band and a canopy comprised
of rolled sheet metal.

|
|
 Allison
Park, PA
- Design/Build
- Cost:
$1,600,000
|
|
Acting
as design and builders, LCS' Limited
Partners erected a two-story commercial
banking center. During the
second phase, an additional floor
was build to house offices, meeting
rooms, board rooms and a break area.

|
|

 Oakland,
PA
- CM
at Risk
- Cost:
$16,000,000
|
|
This
project took 11 months to complete and
included dormitory space, as well as
student common areas. Its construction
consisted of a masonry-bearing curtainwall
utilizing pre-cast planks for the floor
system.

|
|
 Oakland,
PA
- CM
at Risk
- Completed
in 24 months
|
- 250,000
SF Tower
- 272,000
SF Garage
|
This
11-story mixed-use facility was built
for the University of Pittsburgh and
UPMC. The tower includes office space,
classrooms and a computer lab. Beneath
the tower lies a 3-story, concrete underground
parking garage.

|
|
 Greentree,
PA
|
|
- 50,000
SF
- Cost:
$7,000,000
|
This
premier healthcare facility included
doctors's offices, examination rooms,
physical therapy center, and outpatient
clinic. This structure was a prototype
for four other regional facilities,
and was completed in 11 months.

|
|
|
|